The push continues for a means of getting bicyclists between Detroit and Windsor. The two preferred routes are a planned ferry service and the new bridge.
On September 14th, cycling advocates from Windsor and Detroit helped kick off a Share the Bridge campaign. Their focus is to ensure bike access on the New International Trading Crossing (NITC) being promoted by Canada, the state of Michigan, and others. According to Member of Parliament Brian Masse:
“People want the new crossing to be an asset for the community as well as for the North American economy. By investing in cycling and pedestrian infrastructure on the new crossing we will create a signature feature that can have economic, environmental and cultural benefits for the region.”
A press conference was held along the Windsor side of the Detroit River. Masse led the event where he stressed the need for cycling advocates to make this happen. An excellent video from the event has been uploaded with this quote from Masse:
“We get one chance at this border crossing to do it right, and we don’t want to be like the other communities out there that are having to fight to go back and rework things.”
State Representative Rashida Tlaib of Detroit was also there with many other political and cycling supporters.
The campaign asks not only for bicycling access on the bridge, but proper connections to the greenways planned on both sides of the border. Those connections are planned on the U.S. side but not on the Canadian side.
U.S. bridge plans
We’d written about this last December and even showed a bridge cross section design. It appears we were looking an alternative design. The final design has two 10-foot shoulders for bicyclists and a separated 5-foot sidewalk for pedestrians — or less confident bicyclists.
We’ve asked for MDOT’s commitment to these plans, but they are unable to directly address them. Governor’s Rick Synder’s office is handling the project communications.
The Canadians are still unsure of Transport Canada’s commitment.
Will these U.S. plans coerce the Canadians into supporting bicyclists? No one seems to know.
Detroit River ferry service
Masse also visited the Detroit/Wayne County Port Authority in August. His mission was to ensure that Canadian Customs could use this facility for the ferry service. Under this scenario, both customs would be on the U.S. side as is done elsewhere on the border.
The Windsor Star created a couple videos of the event.
The second video is of Steven Olinek, deputy director of the Detroit/Wayne County Port Authority.
To update the community, the Detroit Riverfront Conservancy is hosting a meeting form 6pm to 8pm on Wednesday, October 17th at the UAW-GM Center for Human Resources. The building is on the Detroit RiverWalk at 200 Walker Street.
It’s a free event, but you need to RSVP by October 12th by emailing info@detroitriverfront.org or calling (313) 566-8248.
Globe building groundbreaking
The city of Detroit, DEGC, and DNR and hosting a groundbreaking event for the new Outdoor Adventure and Discover Center at the Globe Trading building. This event is on Saturday, October 6th at 10:30am. The Globe Trading building is at 1900 Atwater Street or more commonly recognized as the large brick structure at the intersection of the Dequindre Cut and Atwater.
What’s this building becoming? According to the DNR, “With hands-on experiences in everything from archery to ziplining, the Outdoor Adventure & Discovery Center will become a base camp for residents and visitors seeking a destination for fun and fitness.” We’re in!
There will be a bike on the Dequindre Cut and a complimentary lunch after the groundbreaking. RSVP by emailing munsond@michigan.gov or by calling (517) 241-0341.
DNR seeking love letters
The DNR will be burying a time capsule at the groundbreaking and they are seeking submissions.
The DNR is looking for stories, sentiment, and visions for the future that can be included in a time capsule that will be buried on the grounds of the Outdoor Adventure & Discovery Center. Submit your Love Letter by October 1 and become part of Detroit’s legacy. Detroit Riverfront Love Letters can be sent via email to Erik Thornbury at ThornburyE@michigan.gov.
There’s been a great deal of media coverage on a proposed agreement between the city of Detroit and the state of Michigan to make Belle Isle a state park.
Based on what we know right now, how would such a lease affect bicyclists?
Belle Isle would remain free if you rode your bike onto the island or brought your bike via a re-established DDOT bus route.
If you bring your bike onto Belle Isle using a motor vehicle, you will need to have a $10 annual Recreation Passport starting in April 2013.
Six to 12 months after signing the lease, the DNR would meet with MDOT to convert some internal roads on the east end of the island into two-way trails — a concept the current park manager has already put forth.
MDOT will assume maintenance on all park roads.
The existing asphalt paths and bathroom facilities would also be improved under the DNR.
One major concern we have is MDOT’s commitment. We want these roads improved, not just maintained. These roads should be made into Complete Streets.
We need sidewalks on many of the roads. Without them, people have little option but to walk in the bike lane.
The two bike lane cross over points at the entrance to the island need to be improved.
The MacArthur Bridge doesn’t require five vehicle travel lanes. We would like one lane removed, the bike lanes widened, and a buffer zone added.
The connection between E. Jefferson and the bridge needs to be improved for cyclists. While the entire intersection needs a redesign, that responsibility would remain with the City.
The Michigan Trails and Greenways Alliance has submitted comments to Detroit City Council that suggest a change to the proposed lease — MDOT should commit to “preserving” these roads, which would include the above ideas and more.
This is a 30-year lease with two 30-year renewals. If this lease goes forward, do we want these roads only maintained as they are for the next 90 years?
MDOT has a greater commitment to state trunklines within the city of Detroit. The roads on Belle Isle should be given that same level of commitment.
MDOT was resurfacing Northwestern Highway this year and did something quite unexpected. They converted the road’s 12 foot paved shoulders to buffered bike lanes.
Originally this road from Inkster to 14 Mile had a 12 foot asphalt shoulder. That shoulder is now a 7 foot bike lanes with a 5 foot painted buffer. Is it ideal for families? Of course not, but many cyclists will find it a comfortable and safe place to ride in spite of the road’s 50 MPH speed limit.
We’ve encouraged MDOT to pursue similar designs on other state roads, but especially in Detroit where there are lower vehicle traffic and under-utilized vehicle travel lanes.
Also, we submitted the new bike lane information to Google Maps for approval.
Why Northwestern Highway?
As we see it, these bike lanes came about for three reasons.
First, the state’s Complete Streets policy encourages MDOT to add biking facilities to its roads.
Second, area cyclists were riding this road segments and had written to MDOT asking for an improved signs to better accommodate cycling. Well, MDOT did better than that. The key was letting MDOT know cyclists were already using Northwestern Highway. This provided documented justification for making the improvement.
Third, there was already a wide, paved shoulder. That made this retrofit very cost effective. The total cost was $21,855 on what was likely a million-some dollar project.
News Coverage
MyFoxDetroit covered this story as part of a segment on bicycling safety. Their story includes a video showing the new lanes.