Archive for the ‘Detroit’ Category

What are the bike lane laws?

Saturday, December 18th, 2010

With new bike lanes being added in the city of Detroit this year (and many more planned for next year), the question has come up: What are the state laws and local ordinances pertaining to them?

The answer in Detroit is there are none. It’s an issue that needs to be addressed.

Unfortunately that’s probably true in many cities, villages, and townships (CVTs) across Michigan that are “maintaining” their own traffic law language. We quoted “maintaining” because most CVTs aren’t. While state laws and national model traffic laws for bicycles have been updated, in many, if not most cases local ordinances have not.

Ideally, all CVTs, including Detroit would eliminate their local traffic laws and simply reference the Motor Vehicle Code (state law) and the Uniform Traffic Code (which is a maintained by the Michigan State Police.) By doing this, everyone would be working off the same set of traffic laws and it would be easier this one copy up to date.

But getting back to bike lanes, what does the Uniform Traffic Code say about them?

PART 1. WORDS AND PHRASES DEFINED
R 28.1001 Rule 1. Words and phrases.
(1) As used in this code:
(c) “Bicycle lane” means a portion of a street or highway that is adjacent to the roadway and that is
established for the use of persons riding bicycles

PART 4. TRAFFIC-CONTROL DEVICES

R 28.1320 Rule 320. Bicycle paths or bicycle lanes; establishment; traffic-control devices.

(1) When the traffic engineer, after a traffic survey and engineering study, determines there is a need, he or she may establish a part of a street or highway under his or her jurisdiction as a bicycle path or lane.

(2) The bicycle path or lane shall be identified by official traffic-control devices that conform to the Michigan manual of uniform traffic-control devices.

R 28.1322 Rule 322. Bicycle lanes; vehicles prohibited; parking permitted under certain conditions; violation as misdemeanor.

(1) A person shall not operate a vehicle on or across a bicycle lane, except to enter or leave adjacent property.

(2) A person shall not park a vehicle on a bicycle lane, except where parking is permitted by official signs.

(3) A person who violates this rule is guilty of a misdemeanor.

One item we don’t like in the above language is the requirement that a traffic engineer determine “a need” for bicycle lane. We would like to see the survey, study and need requirement stricken. It’s an unnecessary cost burden and “need” can be quite vague.

It’s one thing to do a traffic study and determine the need for vehicle travel lanes in order to accommodate traffic flow. One can measure traffic and plug those numbers into a computer model.

It’s quite another to do a traffic study which  determines how unsafe a road is for bicyclists — both perceived and real — without a dedicated bike lane.

Bike Lane-gate apparently closed

Thursday, December 16th, 2010

Call is a conspiracy or just a basic  contractor mistake, the wrong way bike lane pavement marking in Corktown appears to be remedied.

We went past the errant arrow yesterday and between the slush we saw that the paint had been grinded off.

This MDOT project added nearly 2.5 miles of bike lanes on both sides of Michigan Avenue from Rosa Parks to Livernois. It’s a hugely valuable addition to a super wide road that will really complement the Corktown/Mexicantown Greenlink project which should begin construction in the spring. This  backwards biker was the only one we were aware of over the 5 miles.

And thanks to MDOT for getting it fixed in a timely manner.

Metzger Bicycle Shop in 1912

Saturday, December 11th, 2010

Thanks to The Night Train, we saw an excellent photo on Shorpy of the Metzger Bicycle Shop in 1912.

Lot’s of fixies and phonographs — and sundries!

We’d written about Metzger before and how he began selling and manufacturing automobiles as well as  creating auto shows, including Detroit’s.

We thought when he’d sold his interest in the Huber and Metzger Bicycle Shop in 1895 that he got out of the two-wheeled world. That was not the case.

Metzger opened his own bicycle shop which remained in operation, albeit in different locations, at least through the early 1920s. That shop also sold more than just bicycles this 1912 advertisement shows.

Where is 351 Woodward at the corner of  High Street?

High Street was replaced with I-75. 351 Woodward (now 2337 Woodward) is roughly the parking lot just north of Hockeytown.

By 1920, the bicycle shop had moved further north to 2947 Woodward near Charlotte — where the U.S. Social Forum cyclists camped this year.

Fordson Island: A key greenway connection

Thursday, December 9th, 2010

The Detroit News is reporting about an initial clean up of Fordson Island in the Rouge River.

As noted in the article, the island is part of greenway connection between Hines Drive/Rouge Gateway and the Southwest Detroit Greenlink/Corktown.

A conceptual master plan from 2002 shows the Rouge Gateway continuing to follow the Rouge downstream. Currently the Gateway trail ends at Michigan Avenue, but with this plan it would extend southeast to the Fort Street bridge over the river. Fordson Island is directly upstream from that bridge.

And  as we mentioned a couple years ago, the Marathon Oil Company, the island’s primary land owner, wants to donate it for public greenspace. And that pledge to donate the land meant a proposed change to the master plans. That change is to shift the trail from the east river bank to the west and have the trail go across the island.

This connection could really spur economic development — even if it only connects those hungry cyclists on Hines Drive with the awesome Southwest Detroit taquerias.

More updates on the Detroit RiverWalk

Monday, December 6th, 2010

Last week we mentioned that the Detroit RiverWalk, Dequindre Cut, and Milliken State Park were recommended for $34.4 million grant funding. While it would be nearly impossible to top that news, there are other RiverWalk updates since then.

To begin with, the following was posted on the Detroit Riverfront page on Facebook (which has 12,929 likes!):

News Flash: The construction project on the Dequindre Cut is complete and the entire 1.35 mile greenway is open. Also, the parking lot at Rivard Plaza is now open!

While we have not been there yet to confirm, this rebuilt segment of Atwater is to have bike lanes.

More on the Uniroyal site

Today’s Crain’s Detroit Business includes an article on the Uniroyal site cleanup.

This site is the abandoned river property which sits between the MacArthur Bridge (to Belle Isle) and Mt Elliot Park. This is a major missing segment of the RiverWalk. It could also be the terminus for the Gleaner’s Greenway currently being studied.

But it’s not just development plans riding on the cleanup of the Uniroyal site.

Its access to the Detroit River makes it among the last unfinished sections of the 3.5-mile RiverWalk path, said Faye Nelson, CEO of the Detroit Riverfront Conservancy.

She said the funds have been secured to build the RiverWalk on the Uniroyal site once the cleanup is finished.

“Once this site is made available to us, we can make a critical connection to make up the majority of the remaining construction,” she said. “We’re eagerly looking forward to beginning work there.”

If the cleanup begins next March and lasts 18 months as stated then the RiverWalk construction could begin as early as 2013.

A perfect Holiday gift

Want to give something that will last forever? The Detroit Riverfront Conservancy is selling bricks on the RiverWalk.