Author: Todd Scott

  • Detroit-Windsor ferry service for bicycles?

    Detroit RiverWe’ve mentioned the possibility of having ferry service for bicyclists and pedestrians wanting to cross between the U.S. and Canada without needing a car. (Yes, pedestrians can use the Transit Windsor tunnel bus.)

    Now the Windsor Star has an article discussing this possibility.

    North America’s largest private passenger ferry company is in discussions with Windsor and Detroit port officials to link the two border cities by boat.

    NY Waterway, operator of the largest ferry fleet in the New York harbour, has participated in several meetings locally about launching a service across the Detroit River that would focus on transporting commuters, operating tours and carrying fans to sporting events such as Detroit Red Wings’ games.

    Of course this is far from being a done deal according to the article. NY Waterway still needs to determine if this is economically feasible.

    We sure hope it is.

  • Lansing approves Complete Streets ordinance

    Here’s some breaking news from Rory Neuner from the Michigan Environmental Council and a League of Michigan Bicyclists director:

    The Lansing City Council voted unanimously tonight (Monday) to adopt a Complete Streets / Non-Motorized Plan ordinance. We’re thrilled!

    What does this mean?

    There’s more information on this ordinance and how the Lansing Walking & Bicycling Task Force got to this milestone on their web site. But in summary, this ordinance:

    1. Requires the City of Lansing to adopt a Non- Motorized Network Plan.
    2. The Non-Motorized Network Plan would include, at a minimum, accommodations for accessibility, sidewalks, curb ramps and cuts, trails and pathways, signage, and bike lanes, and shall incorporate the principles of Complete Streets and maximize walkable and bikeable streets within the City.
    3. To the extent financially feasible, future construction or reconstruction of City rights-of- way or any parts thereof shall be in conformity with the Non-Motorized Network Plan.
    4. Encourage adequate funding for the plan.
    5. Require an update of the Non-Motorized Network Plan every five years from the date of adoption.

    Passing an ordinance up front is a slightly different route than what was taken in Royal Oak and Troy, but definitely works.

    And perhaps the biggest benefit to what Lansing has achieved is the funding. Making plans is easy. It’s a major challenge finding the money to implement them, especially in these economic times.

    Under current Michigan law (called Act 51), a minimum of 1% of the state road funds each city, village, and county receive must be spent on non-motorized facilities like bike lanes and sidewalks. Some follow this law and some don’t, but that’s a whole other topic.

    The city of Lansing currently spends 2% to 3% for non-motorized facilities. Under this ordinance that  is raised to 5%.

    Congratulations, Lansing!

    The Lansing Complete Streets Ordinance would:


      2. The Non-Motorized Network Plan would
      include, at a minimum, accommodations for
      accessibility, sidewalks, curb ramps and cuts,
      trails and pathways, signage, and bike lanes,
      and shall incorporate the principles of
      Complete Streets and maximize walkable and
      bikeable streets within the City.

      3. To the extent financially feasible, future
      construction or reconstruction of City rights-of-
      way or any parts thereof shall be in
      conformity with the Non-Motorized Network
      Plan.


  • Riding with PEAC

    PEAC cycling in DetroitBicycling means different things to different people: recreation, transportation, independence, fun, fitness, and much more.

    And since was relatively easy for most of us to get into bicycling, we probably take that for granted.

    But for some individuals with disabilities, getting into bicycling is not easy. And fortunately PEAC doesn’t take that for granted.

    PEAC stands for the Programs to Educate All Cyclists. Their purpose is “to enhance the lives of individuals with disabilities by using cycling for transportation, integrated recreation, fitness, and therapy.”

    PEAC helps individuals with cognitive, physical, and emotional disabilities reach their cycling goals… In addition, PEAC strives to integrate cyclists with disabilities into the mainstream cycling community by giving them the skills necessary to participate in tours, races, and bicycle club rides.

    Last month I was fortunate to join PEAC for their weekly Thursday ride in Detroit. Photos from that ride are now on-line.

    Our group rode from the Lenox Center on the Detroit river to Belle Isle via Jefferson Avenue. And although drivers were very courteous, it certainly would have helped had there been bike lanes.

    The PEAC web site has more informtation for those interested in volunteering or making a donation. PEAC is a 501(c)3 non-profit, so donations are tax-deductible.

    Let’s not taking cycling for everyone for granted.

  • Metro Detroit Trail Updates

    Arsonist burns bridge on Polly Ann Trail

    BikeFitness.net is reporting that arsonists set fire to a trail bridge just north of Clarkson Road in Orion Township.

    The arson occurred early this morning. There was still fire retardant foam on the trail and over the creek leading to a pond. There’s no way the bridge can be repaired. It was an old railroad trestle that had just been given a new surface. It will need to be to be taken completely out and replaced. That sure isn’t going to happen any time soon.

    There is a $5,000 reward for tips leading to the arrest and/or conviction of those responsible.

    For photos and additional information, visit the BikeFitness.net web site.

    I-275 Metro Trail work to begin

    First, the I-275 Bike Path now has a new name: the I-275 Metro Trail. Since the trail is not just for biking, this makes sense. It’s also (mostly) within MDOT’s Metro Region.

    HometownLife (via Erie Hiker) has an article on the I-275 Metro Trail reconstruction efforts.

    MDOT is in the process of advertising for a contractor for the $4 million project and, according to MDOT project manager Gorette Yung, expects to have one chosen by October. She said work is expected to begin in the spring and by complete by fall 2010.

    Since this is using stimulus funding, this project has a hard deadline.

    In addition to  this work, MDOT is continuing to make progress on the M-5 Metro Trail between 13 Mile and 14 Mile. It’s expected that this trail will go out to bid this fall with construction beginning in spring of 2010.

    Rail-Trail expansion keeps moving forward

    The Spinal Column has reported on the recent progress with the Huron Valley Trail expansion.

    The Commerce, Walled Lake and Wixom Trailway Management Council has approved a regional master plan for the Michigan Airline Railroad Corridor that stretches through those communities, and has set out to obtain grants that would cover the cost of acquiring the railroad corridor property.

    This trail segment will be critical in that it completes a missing section of the cross-state Michigan Airline Trail. It’ll also connect with Phase II of the M-5 Metro Trail which runs between 14 Mile and Maple and is scheduled to be developed in 2010-2011.

    Fixing up the Macomb Orchard Trail

    There’s a pretty loose and rocky section of the Macomb Orchard Trail that makes biking less than enjoyable. The good news is a 6-inch layer of fines will be layered on top next spring. This new layer should firm up the trail. The same solution was used on a loose section of the Paint Creek Trail many years ago.

  • Woodward: the first mile of concrete highway

    Woodward celebration
    A cake in need of a Blumenauer bike pin

    The Woodward Avenue Action Association (WA3) had a ceremony today to celebrate the 100th anniverary of the world’s first mile of concrete highway. That first mile was Woodward Avenue from McNichols to Seven Mile Road in Detroit. It was just 18 feet wide.

    This historic milestone was very much the result of decades of tireless work, often led by bicyclists such as Horatio “Good Roads” Earle and Edward Hines. WA3 was generous enough to let me briefly speak at today’s event to highlight the cyclists’ role in this project and the Good Roads movement.

    Hines, former chief consul for the League of American Wheelmen Michigan Division was a Wayne County road commissioner (along with Cass Benton and Henry Ford.) He helped oversee this project. Back in 1893, he helped create legislation that enabled county road commissions.

    Earle followed Hines as Chief Consul of the Wheelmen before becoming a state senator and our first state highway commissioner. He founded both MDOT and the American Road Builders Association. The National Cement Association called Earle the “Father of the Concrete Roads of the World.”

    For this Woodward paving project, Earle helped secure Wayne County’s bond and completed the approval inspection on June 21, 1909.

    It’s highly ironic that some motorists question cyclists rights to the roads when we were there first and literally paving the way for improved motoring.

    Moving Forward

    In speaking today, I also noted that we got stuck focusing exclusively on automobiles for some time and that’s now changing. Detroit’s non-motorized master plan calls for bike lanes on Woodward. WA3 has contracted Giffels-Webster for non-motorized planning along Woodward from Eight Mile to Maple.

    And we are closer than ever to getting light rail on Woodward.

    I told the crowd this means “giving people more transportation options,” which elicited perhaps the biggest cheer of event.

    Thanks!

    So, if you go for a ride today, make sure you thank Mr. Earle and Mr. Hines for the smooth ride beneath your tires.

    And here’s an Earlism to consider: “One anvil outlasts hundreds of hammers. If you are anvil-like, a little hammering will not hurt you.”