The Detroit Free Press recently ran this article on trail development throughout Metro Detroit.
“Look at this. There’s so much potential,” Royal Oak City Commissioner Jim Rasor said, as he strode Wednesday in Royal Oak beside railroad tracks where he envisions a hiking-biking trail.
Tonight, the Royal Oak City Commission is to discuss Rasor’s hope to turn 8.5 miles of unused land next to the Canadian National Railway tracks — from Royal Oak to Bloomfield Township — into a public trail, tying south Oakland’s bike lanes to north Oakland’s wooded paths.
I recently gave the following public comment on the rail-with-trail concept at Monday’s City Commission meeting:
I encourage the City Commission to explore a rail with trail along the Grand Trunk right-of-way.
Originally this rail line headed northwest out of Royal Oak following Sherman before meeting up with and paralleling Woodward. When the state of Michigan wanted to widen Woodward, they bought land and re-routed the railroad to its current location.
The plan was to build four parallel rail lines, but only two were ever built. The result is there is unused space along the right-of-way which is now a two-track dirt path.
It seems that unused space could accommodate a non-motorized trail.
And wouldn’t this be a great way to bring people into our Downtown?
This would not be the first rail-with-trail. They exist throughout the United States, including ones in Ann Arbor and Traverse City. Nationwide, rails-with-Trails have a perfect safety record. They have a much better safety record than roads and sidewalks.
As someone who lives within eyesight of the railroad and who has had their home appraised, I know how it reduces my property value. Creating a rail-with-trail would increase property values throughout the city, but especially for those of us living close to the rail line.
The response from the commission was mixed. Some wanted to punt this to the county. In fact, Commissioner Drinkwine said the Paint Creek Trail had been spearheaded by the county — it wasn’t. It was spearheaded by grassroots efforts and local governments. The county does not provide leadership on trail projects outside of their own parks.
Nonetheless, I am meeting with Royal Oak city staff this week to provide more information on next steps, especially as it relates to the non-motorized planning process which is expected to begin in February or March.