Posts Tagged ‘Detroit Riverfront Conservancy’

Dequindre Cut Construction Continues

Wednesday, May 21st, 2008

It’s getting closer.

The expected completion date for Phase I is this summer. It appear the electrical is currently being installed. There is still a lot of steel beams which may be for the Antietam Bridge replacement. The main trail portion (the east half of the right-of-way) is graded, along with the two vehicle access points at Gratiot and Lafayette.

One clarification should be made. Many, including myself thought the Detroit Riverfront Conservancy was responsible for constructing the Cut. They aren’t. The City of Detroit is with the DEGC managing the project. However, once completed, the Conservancy will handle this trail’s operations, maintenance, and programming.