Posts Tagged ‘Midtown Loop’

Detroit greenways ready for expansion

Monday, August 29th, 2011

Detroit RiverWalk

More sections of the RiverWalk should be under construction come next spring. That includes segments on both sides of Chene Park and the critical connection between Mt. Elliott Park and Gabriel Richard Park at the foot of the bridge to Belle Isle.

Mt. Elliott park is getting a new universal recreation play structure that includes a super cool water feature.

Gabriel Richard Park is getting a parking lot.

And the grassy land just north of the Wheelhouse Detroit is getting a children’s playground.

It’s not too late to buy tickets for the Shimmer on the River event, a fundraiser for the RiverWalk.

Today’s Crain’s Detroit Business has an article which includes more details on this exciting news.

Dequindre Cut

The Dequindre Cut rail corridor north of Gratiot is not only active but privately owned. The city of Detroit has been negotiating with the owner to acquire the property while allowing them to keep their rails, which are mostly used to railcar storage. The city is getting closer to finalizing the deal.

Once purchased, the trail will switch over to the west side of the Cut at Gratiot and continue north to Mack. The rails will remain on the east side of the Cut and will be fenced off. There will also be trail connection into Eastern Market near Wilkins and near the Greening of Detroit’s urban agriculture demonstration area.

The city will likely apply for significant grant funding this fall to build this extension, as well as complete some Eastern Market streetscaping, build a bike/walk connection to the Midtown Loop, add bikes lanes to Hamtramck, and repair the bridges over the Cut.

Midtown Loop

The last we knew, construction for Phase II of the Midtown Loop will begin this fall. That includes the sections along Canfield and Cass.

Conner Creek Greenway

The next segment to be built will run from Eight Mile to McNichols along Conner Avenue. It includes new sidewalk, bike lanes and bike route signs. That won’t likely begin until next year.

Detroit Greenway construction photos

Monday, May 17th, 2010

Here are some photos from Sunday which show greenways under construction (in all senses) throughout Detroit.

Midtown Loop Greenway breaks ground in Detroit

Friday, April 16th, 2010

Today was a big day. Another greenway in Detroit — the Midtown Loop — was officially under construction starting this week and there was a celebration on the lawn of the Detroit Institute of Arts.

From this UCCA/CFSEM press release:

Construction is underway on the Midtown Greenway, a four phase, two-mile greenway trail that will circle through Detroit’s University Cultural Center, Wayne State University and Medical Center and Brush Park districts.

Today at a press conference held at the Detroit Institute of the Arts, organizers officially broke ground to signify the start of the first of four phases of construction. When completed, the linked trails will provide eight miles of continuous greenways, enabling people to go from Wayne State University through the Eastern Market to the Detroit Riverfront.

“One of our main goals with the development of the Midtown Greenway is to reclaim the rights-of-way for pedestrians by creating a widened walkway, improving ADA (Americans with Disabilities Act) crosswalks, and adding pedestrian traffic signals,” said University Cultural Center Association President Susan Mosey. “By adding such amenities along the route as outdoor seating, pocket parks and pet-friendly features, this trail will contribute to the quality of life and the lifestyle of the community.”

Mosey noted that only the first phase (Kirby and John R) is under construction and should be completed this year. She expects the Canfield segment construction will begin this fall with the Cass section beginning in 2011. The entire loop should be ready to go by the end of next year.

But that’s not all. The UCCA is also working on non-motorized connections to the Dequindre Cut.

And as we’ve noted before, this greenway is geared towards pedestrians and slower cycling. Commuters and faster cyclists may prefer sticking to the streets. This is similar to the current RiverWalk vs. Atwater tradeoff.

TellUsDetroit.com did some excellent interviews which are now on-line.

http://www.youtube.com/watch?v=UE6F3tBx17U&feature=player_embedded

One highlight? Sunny Jacob from Traffic Engineering explaining this project’s focus on Complete Streets and livable communities — something the city of Detroit is now pushing.

This project is all about making the street safe and walkable for all uses… and its the new concept called Complete Streets. We are pushing forward with the city of Detroit to make new communities and make them user friendly for all the uses.

Secretary LaHood — Detroit’s talking the talk and would make an excellent candidate for the next round of federal TIGER (as well as ACT) funding.

We’ve uploaded a video of Al Fields speech. Al is Mayor Bing’s Group Executive for Planning, a very active cyclist, and the one you should thank for Detroit’s first bike lanes (on Belle Isle.)

Mid-April project photos from around Detroit

Sunday, April 11th, 2010

Below are photos taken from various projects around Detroit that are key components to a more bike friendly city.

Also, M-Live/Associated Press has published a more thorough story on the Midtown Loop, which is set to break ground this Thursday.

Construction starts next week on the Midtown Greenway, which by the fall will be an improved route for pedestrians and bicyclists around Detroit’s Cultural Center area and Wayne State University’s campus.

It’s the first part of a four-phase project that by 2012 is expected to link the area with Eastern Market and the Detroit riverfront. It will widen walkways, as well as add landscaping, bike racks, benches and small park areas.

“We wanted to create a more walkable district … and to beautify the neighborhood and to really help spur on more economic development,” Susan Mosey, president of the University Cultural Center Association, which is spearheading the project, said Friday.

Read the entire article

New trails, bike shops, and more

Friday, April 9th, 2010

New Trail: Midtown Loop

The official ground breaking ceremony for the Midtown Loop is scheduled for next Thursday, April 15th.

From WLNS:

Construction starts next week on the Midtown Greenway, which will begin as a route for pedestrians and bicyclists circling through Detroit’s Cultural Center area and Wayne State University’s campus.

It’s the first part of a four-phase project that by fall 2012 is expected to link the area with Eastern Market and the Detroit riverfront. Construction crews begin work Monday and an event to mark the start is Thursday.

University Cultural Center Association President Susan Mosey said the project will widen walkways to create more room for pedestrians and bicyclists, as well as add landscaping, bike racks, benches and small park areas.

The greenway is designed make the area, which includes the Detroit Institute of Arts, more friendly to pedestrians and bicyclists.

One thing to keep in mind is that this trail is not geared towards commuters or fast cyclists. It’s a trail for a relaxed, family and touristy rides.

New Bike Shop: Downtown Ferndale Bike Shop

There’s a new bike shop opening in town and there’s a official opening celebration tomorrow, April 9th at 2pm. The shop is located at 163 W. Nine Mile in Ferndale.

Volunteers needed: I-275 Metro Trail Cleanup

From the Detroit Free Press:

Volunteers are needed Saturday for spring cleaning on the I-275 bike path just east of Meadowbrook Road.

Friends of the I-275 Pathway plan to work from 9 a.m.-noon removing litter, trimming overgrown brush and shoveling mud from the path, said communications chair John Bailey, who is a WWJ-AM (950) radio traffic reporter.

Volunteers can park in the commercial parking lot at the northeast corner of Bridge Street and Meadowbrook, on the east side of Meadowbook just south of I-96. Bring flat shovels, rakes and other tools to scrape mud off pavement, he said.

For information, call 248-994-3074 anytime.

Donations sought: Beaumont Bike Day

From My Fox Detroit:

Kids riding on bikes is a sure sign of the season. But for special needs children, riding a bike seems like just a dream. But thanks to Children’s Miracle Network , that dream can come true.

They provide funding for Bike Day at Beaumont Children’s Hospital and you can help as well since these just aren’t any bikes. They’re custom made to suit each child.

FOX 2 and Gardner-White Furniture are asking you to support bike day. Every dollar you donate goes directly to the program allowing each bike to be provded for free. Drop by any Gardner-White Furniture location to make a donation. Or log on to www.beaumonthospitals.com/donate and select ‘Bike Day’ in the drop down to donate online.