Archive for the ‘MDOT’ Category

Construction barrels on I-275 bike path

Wednesday, April 14th, 2010

Dave Duffield (from the LMB) and HometownLife.com recently posted MDOT’s reconstruction plans for the I-275 Metro Trail.

Trail Segment Construction begins by Expected completion
Hines Drive to Meadowbrook Early next week October 2010
Michigan Ave to Hines Drive Early next week July 2010
South of Michigan Ave 2011 TBD

Duffield adds, “Please refrain from using the path at all, especially the middle section. It will be totally impassible once they start ripping it up.”

The HometownLife.com article adds:

An enthusiastic group of trail users attended an open house held Tuesday by The Michigan Department of Transportation to hear about upcoming improvements to the I-275 Pathway.

During the meeting at the Plymouth Township Town Hall, MDOT and the contractors involved in design, planning and construction of the trail upgrades explained more about the project.

Trail users were also asked for input on certain design features, including the style of wayfinding signage and the four new bridges. The signage will help users find the path, point the way to nearby trails, and brand the 35-year-old trail with an identity to go along with its new name: the I-275 Metro Trail.

Yes, fellow cyclists. Orange barrel season has begun on the trails, too.

Novi Transportation Improvement Project

Tuesday, April 13th, 2010

Novi Councilmember Andrew Mutch passed along this information.

MDOT is conducting a transportation study of the I-96/12 Mile/Grand River corridors through the Novi and Wixom areas. For those interested in sharing your thoughts related to transportation-related issues, there’s an online survey to complete on the web site. Quite a few questions are related to non-motorized transportation concerns.

According to the site, the survey only takes 15 minutes to complete. This is a good opportunity to express your concerns with respect to non-motorized transportation options within the study area.

Another I-275 Metro Trail open house

Tuesday, April 13th, 2010

From MDOT:

I-275 Metro Trail (from Hines Drive to Michigan Avenue)

Public Open House

April 20, 2010 from?6 – 8 p.m

Fellows Creek Golf Club

2936 Lotz Road, Canton, MI 48188

The Michigan Department of Transportation and project team staff will host an open house to provide an overview of the project scope and boundaries of this approximately 7-mile section of the I-275 Metro Trail. This section is planned for reconstruction beginning this spring. This is the last open house planned prior to construction. There will be an opportunity to review the final design selections prior to construction.

For more information, please contact:

Bicyclists and pot holes

Saturday, April 3rd, 2010

MDOT recently issued this press release:

MDOT offers toll-free pothole hotline to Michigan motorists

March 31, 2010Freezing and thawing cycles lead to potholes in the spring. In addition to a toll-free pothole line, the Michigan Department of Transportation (MDOT) has posted a form on the MDOT Web site to encourage motorists to report potholes on state roads. Reports of potholes on state roads (M, I and U.S. roads only) will be routed to the nearest MDOT Transportation Service Center (TSC).

“The pothole hotline is an easy and efficient way for residents to help us identify potholes on state roads that need to be repaired,” said State Transportation Director Kirk T. Steudle. “We hope that residents will call the hotline or use the link on the MDOT Web site to report potholes that need attention.”

To report a pothole, call 888-296-4546, around-the-clock, seven days a week, or use the “Report Potholes” link on the MDOT Web site at?www.michigan.gov/mdot. Those reporting pothole locations are asked to provide the route name (M, U.S. or I designation), the county, the nearest community, and the closest cross street or interchange. Potholes on non-state roads should be reported to local road commissions since MDOT does not have jurisdiction over roads that are not part of the state system.

Information about how potholes are formed is available on the MDOT Web site at www.michigan.gov/mdot/0,1607,7-151-9615_30883—,00.html.

The title is misleading. Other road users, including cyclists can report potholes — not just motorists.

As you may know, MDOT has a reimbursement program if one of these potholes damages your vehicle. According to a 2004 VeloNews article, Michigan bicyclists should be able to make claims as well. The MDOT claim forms are not specific to motorists.

Still, getting reimbursed is not easy according to MDOT.

The state will consider an award only for the damages beyond what has been paid by your insurance company, and the state must have been aware of the pothole for 30 days without repairing it in order for a claim to be eligible for reimbursement.

Also note that parts of that VeloNews article are outdated due to more recent court decisions.

A 2006 court case determined that by law, counties and MDOT are only liable for vehicular travel lanes.

“The duty extends only to the improved portion of the highway designed for vehicular travel and does not include sidewalks, trail ways, crosswalks, or any other installation outside of the improved portion of the highway designed for vehicular travel…”
Grimes v MDOT (2006)

It also doesn’t include paved shoulders or bike lanes — bikes are not vehicles under Michigan law. On one hand, that’s good for convincing road agencies to build bike facilities (no added liability.) However, that also means cyclists are not afforded the same protections as motorists.

According to the state attorney general’s office, the liability extends beyond potholes to include:

  • Rutting
  • Manhole covers
  • Dilapidated road surface
  • Traveled (vehicle) lane edge drops
  • Missing storm sewer grates

Either way, it’s imperative that cyclists keep a keen eye on the road conditions this time year until the patching crews can get some repairs made.

I-275 Metro Trail Open House

Friday, March 19th, 2010

MDOT is hosting a public open house to discuss the I-275 Metro Trail from Hines Drive to Michigan Avenue.

March 30, 2010 from 6 – 8 p.m

Plymouth Township Hall, Town Hall Room, 9955 N. Haggerty Road, Plymouth, MI 48170

MDOT and project team staff will host an open house to provide an overview of the project scope and boundaries of this approximately 7-mile section of the I-275 Metro Trail. This section is planned for reconstruction beginning this spring. There will be an opportunity to provide written feedback and input on various elements of the project including trail signs and bridge aesthetics.

For more information, please contact:

  • Gorette Yung at 313-375-2400, yungg@michigan.gov
  • Leah Groya at 313-961-3650, lgroya@wadetrim.com
  • Jayson Nault at 810-220-2112, jayson.nault@tetratech.com

A third and final public open house regarding this section of the trail will be scheduled for April.

Also, Associated Online published an article on the I-275 Metro Trail reconstruction.

The work includes a complete reconstruction of the path between Michigan Avenue and Hines Drive, [John Bailey] said.

“The path will be upgraded to present-day standards, including widening it to 14 feet, constructing proper drainage and slopes, and bringing it in line with ADA compliance,” he said.

It is good to know that you can have your residential drainage system repaired quite fast as well. Flo-Well Drainage Company can conduct a comprehensive drainage survey and fix everything asap.

Repairs will also be made to the section from Hines Drive north to Meadowbrook Road, which Bailey said isn?t as badly deteriorated as the southern section.

The work includes four new bridges, too: over Fellows Creek, Tonquish Creek, Wiles Drain and Smith Drain.

There’s also positive news on the north end of the I-275 Metro Trail. The Commerce, Walled Lake, and Wixom Trailway Management Council is applying for trail grant funding after a public hearing. The public comment was nearly unanimously in favor of converting this rail line to a non-motorized trail. The lone opposition came from a local business that receives material deliveries from the rail line. Receiving those deliveries by truck would increase their manufacturing costs.

The council hopes to purchase the 5.33 mile railroad and turn it into a paved, non-motorized pathway that will connect to the Huron Valley Trail and the West Bloomfield Trail.

This grant would match an MDOT grant and allow for land acquisition. Later grants would be sought to improve the trail surface, signage, etc.