Posts Tagged ‘Clinton River Trail’

Clinton River Trail bridge ready for construction

Friday, April 2nd, 2010

The Oakland Press has an article on the new pedestrian/bike bridge over Telegraph Road just north of Orchard Lake. This is a critical missing piece of the Clinton River Trail and will be very welcomed as there are no safe alternatives given the area’s poor road designs.

Bids were expected Thursday on the project with construction starting in late May and early June.

The bridge should be completed by Nov. 15, according to officials.

Mayor Leon Jukowski said the bridge would provide a safe place for people to enjoy the natural beauty of the parks and river trail.

“It’s a great opportunity for the city and it will connect us with our neighboring communities,” he said.

This project is being paid for through the American Recovery and Reinvestment Act (ARRA) also know as the stimulus funding.

Trail updates in Pontiac and Shelby Township

Friday, August 7th, 2009

Shelby Township Trail as shown in the Macomb County Trails master planShelby Township Trail

The Detroit News is reporting on a 1.2 mile extension of Shelby Township’s trail which would eventually connect with the Metro Parkway trail via Utica. This extension is part of the 70-mile Macomb Country Trail Loop.

What this trail really needs is a safe crossing of Avon Road near the Yates Cider Mill and a bridge over the Clinton River. This would create a great connection to the Clinton River and Macomb Orchard Trails.

Clinton River Trail in Pontiac

The Oakland Press provided an updated on two Clinton River Trail projects on the west side of downtown Pontiac.

  • A connection from downtown to the rail-trail segment of the Clinton River Trail near Bagley
  • A bridge over Telegraph near Orchard Lake Road

The latter will be especially appreciated and is a critical connection along the Clinton River Trail. It should be under-construction sometime next year.

Detroit Trails on Facebook

Monday, June 15th, 2009

bandThe Detroit Riverfront Conservancy has an active page on Facebook.

Their Dequindre Cut trail opening photo gallery is full of great shots, including this one to the right. It certainly shows Detroit knows how to open a trail will style and enthusiasm.

But there are other Detroit trail- or bike-related groups on Facebook, including these:

Metro Detroit Trails in the Media

Wednesday, April 15th, 2009

During the past week, at least three different trails have been written about in the Metro Detroit newspapers, though most of the information has already been reported on this site.

Here are some excerpts:


From The Oakland Press

Portion of dinner train route will soon be a trail

A section of railroad used for a dinner train will become connected to a West Bloomfield trail system.

A $1.5 million grant from the Michigan Natural Resources Trust Fund will pay for the project.

Plans call for the section of railroad between Arrowhead Road and Haggerty Road to be abandoned, the tracks removed and the trail connected to the west end of the West Bloomfield Trail, a 4.25-mile trail that winds through the township and which was once rail lines.


From The Oakland Press

Pontiac to use $2.1 million grant to build bridge

A $2.1 million stimulus grant has been awarded to the city of Pontiac to build a pedestrian bridge over Telegraph Road to link pathways along the Clinton River Trail, city officials announced Thursday.

The bridge, north of Orchard Lake Road and south of Voorheis, will connect the 16-mile trail that links the cities of Sylvan Lake, Pontiac, Auburn Hills, Rochester Hills and Rochester.

Department of Public Works & Utilities Acting Director Allan Schneck said Pontiac has been the weak link in the line to connect trails from South Lyon all the way to Rochester Hills in Oakland County. Most of the trail has been connected except for the portion through Pontiac.


From the Detroit Free Press

Recreational path in Detroit to open May 14

The much-delayed Dequindre Cut Greenway, an urban recreational path connecting the east riverfront with the Eastern Market district, will finally open to the public on Thursday, May 14.

There will be a grand opening ceremony at 10 a.m. and activities and entertainment until 2 p.m., according to the Detroit Riverfront Conservancy, the nonprofit organization that will maintain the Cut.

The 1.2-mile paved greenway was developed through a public, nonprofit and private partnership. It is part of a growing network of greenway paths developing around the city.

Our Economic Stimulus Bike Projects

Saturday, April 4th, 2009

img_1255The first round of Metro Detroit’s transportation stimulus checks are in the mail and some are for major bike projects.

This funding is mostly from 3% transportation enhancements sub-allocation, which is $25.4 million for all of Michigan.

I-275 Bike Path (MDOT)

The original $10 million request to recontruct the bike path was reduced to two requests. The first is for $4 million. The second is for $5 million and will only be available if Michigan can recover unused road funds from other states.

Clinton River Trail Bridge (Pontiac)

This bridge at Telegraph and Orchard Lake Road has been long awaited. It will connect the two developed rail-trail segments on both sides of Telegraph. The funding amount is $2.1 million.

Midtown Loop (Detroit)

This $2.3 million in funding is going towards Phase I of the Midtown Loop, a 2-mile walking and (casual) biking loop through Wayne State and cultural center. It’s expected that this stimulus money will push previously secured funding into the second phase and possibly help fund the connector between this project and the Dequindre Cut.

Streetscaping

These projects are aimed at making a road more pedestrian and bicyclist friendly. For example, the Woodward project includes “sidewalks, tree planting, street lights, trash receptacles, bike racks.”

  • Woodward in Detroit between I-94 and Euclid (MDOT)
  • Monroe and Brush Streets in Greektown, Detroit
  • Michigan Avenue in Detroit between Cass and Woodward
  • Shelby Street in Detroit between State and Griswold

Transit-Related Projects

Both DDOT and SMART are receiving funds to improve/build bus shelters and related amenities. We’ll contact both to determine whether these projects include bike racks. DDOT has been pursuing bike racks for their bus shelters as well as their buses.

Other Detroit Road Work

We checked and none of MDOT’s Detroit stimulus road work coincides with the city’s non-motorized plan. However MDOT is replacing some bridge decks over I-96 which may coincide with the plan.

Wayne County is receiving funds to reconstruct sections of 7 Mile and Fenkel Roads. Both should have bike lanes. We will contact both Wayne County and the city officials to make sure this is known.

The city of Detroit is receiving over $14.4 million for major street repair. Once we learn which roads those involve we’ll cross check them with the non-motorized plan to see if they are scheduled for bike lanes.

This should clearly show the value of having non-motorized plans in place for cities.

All of MDOT’s Metro Region stimulus projects are available on-line. SEMCOG also has a list of all accepted project requests within their seven-county area.