Posts Tagged ‘Dequindre Cut’

Those No Bikes Signs on the Dequindre Cut

Thursday, April 30th, 2009

img_2312Yes, there are “No Bikes” signs on the Dequindre Cut.

Yes, bikes will be allowed on the Dequindre Cut.

Those signs are merely in place to discourage use while the trail is under construction. They will eventually be removed. That’s also why the gated entrance at Lafayette Boulevard has been closed.

Don’t forget the Dequindre Cut grand opening is set for 10am on May 14th at the south end of the trail (at Woodbridge.)

Bring your parade bike and we’ll see you there!

Spring means Bicycle Love in Detroit

Thursday, April 23rd, 2009

Biking on the Dequindre CutThe Metro Times just released their 2009 Best of Detroit lists.

Among the staff picks was Best Place to Break a Sweat with the winner being “bicycling”.

Detroiters have been getting more and more serious about bicycle love in recent years. First came the flirtation. It wasn’t love at first ride. No, it’s hard to fully commit to a self-powered two-wheel approach when you’re dubbed the Motor City, when coney dogs, cheap beer and Flaming Hot Chee-tos are local fare and, well, let’s face it, there aren’t too many bike-friendly paths. But flirt we did. After a couple dates, we started to grope the spokes and pump the brakes. One thing led to another and here we are … With the HUB of Detroit – that funky full-service (not-for-profit) bike shop set in the pit of Cass Corridor – the seed was planted. Then came “bike gangs” such as Ferndale’s Defying The Law B/C, and city-wide races like Alley Cat. Last year (almost to the day this goes to print) we witnessed the birth of Wheelhouse Detroit, a bike retail, rental and repair shop that lives right on the river and offers a wide array of bike tours that take riders through the architectural anomaly that is Detroit, through Corktown, Hamtramck, along the river and a number of others. A missing piece was put into place a couple years ago when the Dequindre Cut project was announced. The Cut runs along the Grand Trunk rail line, through Eastern Market, and ends at Detroit’s riverfront parks. The paved, lit, emergency phone-equipped bike-walk-jog stretch from Gratiot to south of Jefferson will get its grand opening May 14.

In last year’s polling, the Dequindre Cut won for the best project that’s not yet completed. Phase I will be completed this year, and as noted, the grand opening is May 14th at 10AM.

And in the Reader Polls, Best Place to Buy a Bicycle went to The Hub of Detroit.

The Hub of Detroit grew out of Back Alley Bikes, a youth program designed to get low-income youths their very own bicycles. The volunteer organization needed a way to fund their philanthropic endeavors and saw a need in Detroit for a bike shop. So the Hub was born, killing two birds with one ultra-cool stone. Not only do Detroiters now have a place to purchase a used bike, fix up an old set of wheels and to buy biking accessories, but all proceeds from the shop go directly to Back Alley Bikes. The staff which consists primarily of volunteers runs a variety of classes and programs for area youth, including having kids 13-18 clock volunteer hours in the shop to earn their own bike.

To see all the other 2009 “Best Of” winners, check out the Metro Times web site.

Metro Detroit Trails in the Media

Wednesday, April 15th, 2009

During the past week, at least three different trails have been written about in the Metro Detroit newspapers, though most of the information has already been reported on this site.

Here are some excerpts:


From The Oakland Press

Portion of dinner train route will soon be a trail

A section of railroad used for a dinner train will become connected to a West Bloomfield trail system.

A $1.5 million grant from the Michigan Natural Resources Trust Fund will pay for the project.

Plans call for the section of railroad between Arrowhead Road and Haggerty Road to be abandoned, the tracks removed and the trail connected to the west end of the West Bloomfield Trail, a 4.25-mile trail that winds through the township and which was once rail lines.


From The Oakland Press

Pontiac to use $2.1 million grant to build bridge

A $2.1 million stimulus grant has been awarded to the city of Pontiac to build a pedestrian bridge over Telegraph Road to link pathways along the Clinton River Trail, city officials announced Thursday.

The bridge, north of Orchard Lake Road and south of Voorheis, will connect the 16-mile trail that links the cities of Sylvan Lake, Pontiac, Auburn Hills, Rochester Hills and Rochester.

Department of Public Works & Utilities Acting Director Allan Schneck said Pontiac has been the weak link in the line to connect trails from South Lyon all the way to Rochester Hills in Oakland County. Most of the trail has been connected except for the portion through Pontiac.


From the Detroit Free Press

Recreational path in Detroit to open May 14

The much-delayed Dequindre Cut Greenway, an urban recreational path connecting the east riverfront with the Eastern Market district, will finally open to the public on Thursday, May 14.

There will be a grand opening ceremony at 10 a.m. and activities and entertainment until 2 p.m., according to the Detroit Riverfront Conservancy, the nonprofit organization that will maintain the Cut.

The 1.2-mile paved greenway was developed through a public, nonprofit and private partnership. It is part of a growing network of greenway paths developing around the city.

Our Economic Stimulus Bike Projects

Saturday, April 4th, 2009

img_1255The first round of Metro Detroit’s transportation stimulus checks are in the mail and some are for major bike projects.

This funding is mostly from 3% transportation enhancements sub-allocation, which is $25.4 million for all of Michigan.

I-275 Bike Path (MDOT)

The original $10 million request to recontruct the bike path was reduced to two requests. The first is for $4 million. The second is for $5 million and will only be available if Michigan can recover unused road funds from other states.

Clinton River Trail Bridge (Pontiac)

This bridge at Telegraph and Orchard Lake Road has been long awaited. It will connect the two developed rail-trail segments on both sides of Telegraph. The funding amount is $2.1 million.

Midtown Loop (Detroit)

This $2.3 million in funding is going towards Phase I of the Midtown Loop, a 2-mile walking and (casual) biking loop through Wayne State and cultural center. It’s expected that this stimulus money will push previously secured funding into the second phase and possibly help fund the connector between this project and the Dequindre Cut.

Streetscaping

These projects are aimed at making a road more pedestrian and bicyclist friendly. For example, the Woodward project includes “sidewalks, tree planting, street lights, trash receptacles, bike racks.”

  • Woodward in Detroit between I-94 and Euclid (MDOT)
  • Monroe and Brush Streets in Greektown, Detroit
  • Michigan Avenue in Detroit between Cass and Woodward
  • Shelby Street in Detroit between State and Griswold

Transit-Related Projects

Both DDOT and SMART are receiving funds to improve/build bus shelters and related amenities. We’ll contact both to determine whether these projects include bike racks. DDOT has been pursuing bike racks for their bus shelters as well as their buses.

Other Detroit Road Work

We checked and none of MDOT’s Detroit stimulus road work coincides with the city’s non-motorized plan. However MDOT is replacing some bridge decks over I-96 which may coincide with the plan.

Wayne County is receiving funds to reconstruct sections of 7 Mile and Fenkel Roads. Both should have bike lanes. We will contact both Wayne County and the city officials to make sure this is known.

The city of Detroit is receiving over $14.4 million for major street repair. Once we learn which roads those involve we’ll cross check them with the non-motorized plan to see if they are scheduled for bike lanes.

This should clearly show the value of having non-motorized plans in place for cities.

All of MDOT’s Metro Region stimulus projects are available on-line. SEMCOG also has a list of all accepted project requests within their seven-county area.

Dequindre Cut Community Roundtable

Sunday, February 22nd, 2009

dqThe Detroit RiverFront Conservancy is hosting a community planning roundtable for the Dequindre Cut on Tuesday, February 24th from 5:30pm until 7:30pm.

According to the invite:

We are planning the opening celebration and programming for the Dequindre Cut! As a member of the East Riverfront community; we want to hear from you! Space is limited. You must RSVP to attend. Refreshments will be served.

The rountable is being held at the UAW-GM Center for Human Resources on the river. Their address is 200 Walker Street Detroit, Michigan 48207.

RSVP’s were due Friday so don’t delay. As they note, space is limited.

One can RSVP using email or by calling 313.566.8206.