Posts Tagged ‘MDOT’

MDOT adds buffered bike lanes to Northwestern Highway

Sunday, September 23rd, 2012

MDOT was resurfacing Northwestern Highway this year and did something quite unexpected. They converted the road’s 12 foot paved shoulders to buffered bike lanes.

Originally this road from Inkster to 14 Mile had a 12 foot asphalt shoulder. That shoulder is now a 7 foot bike lanes with a 5 foot painted buffer. Is it ideal for families? Of course not, but many cyclists will find it a comfortable and safe place to ride in spite of the road’s 50 MPH speed limit.

We’ve encouraged MDOT to pursue similar designs on other state roads, but especially in Detroit where there are lower vehicle traffic and under-utilized vehicle travel lanes.

Also, we submitted the new bike lane information to Google Maps for approval.

Why Northwestern Highway?

As we see it, these bike lanes came about for three reasons.

First, the state’s Complete Streets policy encourages MDOT to add biking facilities to its roads.

Second, area cyclists were riding this road segments and had written to MDOT asking for an improved signs to better accommodate cycling. Well, MDOT did better than that. The key was letting MDOT know cyclists were already using Northwestern Highway. This provided documented justification for making the improvement.

Third, there was already a wide, paved shoulder. That made this retrofit very cost effective. The total cost was $21,855 on what was likely a million-some dollar project.

News Coverage

MyFoxDetroit covered this story as part of a segment on bicycling safety. Their story includes a video showing the new lanes.

Detroit River ferry would help cyclists cross the border

Saturday, July 21st, 2012

Detroit River ferry service was back in the news last week – the Windsor news that is.

This CBC video and article provide a good background on where we stand with ferry service, including its potential to help bicycle tourism.

Gord Orr with Tourism Windsor Essex Pelee Island said the idea holds great promise.

“The potential of the bicycle tourism part of it is very exciting as we start to look at more trails and routes and see how we can increase more of that healthy lifestyle,” Orr said.

We agree. We need to connect the Detroit RiverWalk and Windsor River trail, as well as provide a crossing for the Underground Railroad Bicycle Route and future U.S. Bicycle Routes.

The CBC ran a similar article that spoke with MP Brian Masse of the Canadian Parliament.

“To me, this would be an exciting opportunity to put pedestrians and cyclists back and forth along the water,” Masse said. “Detroit has a marvellous waterfront now. They’ve worked hard on it and need to be commended for it. Ours, of course, is really nice and has been remodelled recently. This could be an exciting time to share both of our cultures again.”

The Windsor Star also chimed in with an article that also quoted Orr.

“I think that allowing passenger travel on ferry and bicycles included would also help the interest in cycle tourism. We have a number of trails to be enjoyed by cycle tourists and obviously this would eliminate the hassle of parking, crossing an international border at the tunnel or the bridge.”

It sounds like we’ve got the message out about the importance of this crossing, at least on the Canadian side.

What about the new bridge?

Progress continues to be made on a new Detroit/Windsor bridge – the NITC.

As mentioned earlier, the plans call for a bicycle/pedestrian path on one side of the bridge. We spoke with State Representative Rashida Talib. She said that if it’s in there, it’s unlikely MDOT can renege.

On the Windsor side, bicycle advocates are now making sure Canadian Customs is prepared to handle bike and pedestrian traffic. They also want to ensure their new greenways connect with the bridge. MTGA submitted comments to U.S. and Canadian officials asking that greenways are connected to the bridge.

Do cyclists need a bridge and ferry service? We think so. The bridge would be a 24/7 option, but it comes with a steep price – a steep climb. It’s also located a short distance away from the riverfront trails and downtowns. Ferry service would be more centrally located and you’d only have to climb on board a boat. However, ferry service might not be available year round. The bridge would also provide some amazing views.

Zeboats offers a wide range of solutions for boating enthusiasts as well as all kinds of boating related products. If you are looking for a perfect boat we suggest you start your search on easy to use platform and because they offer a range of different boats to suit every budget from a small single person craft right up to a large speedboat.

Bridge path a greenway?

Also, one suggestion is to create a name for this trail connecting Detroit and Windsor. Something like the International Freedom Trail sounds much better than just calling it the bike path on the bridge. Who could be against a trail with a name like that?

Or can you think of a better name?

MDOT announces 2012 Training Wheels workshop dates

Tuesday, July 10th, 2012

The Training Wheels program is an invaluable training that provides insight on how to redesign roads to better accommodate cyclists. It’s beneficial to the seasoned planner as well as the casual cyclist looking to make their city more bike friendly. The costs vary but are minimal (e.g. River Rouge is $15.)

Here is the press release from MDOT:

MDOT promotes on-road bicycling facilities

June 18, 2012 — The Michigan Department of Transportation (MDOT) is sponsoring “Training Wheels” courses around the state designed to educate communities interested in providing on-road bicycle facilities for their residents and visitors. The five-hour course includes both classroom and outdoor instruction. The courses will be offered in the following areas:

  • July 16 in Alma
  • July 17 in St. Ignace
  • July 18 in Ferndale
  • July 19 in River Rouge
  • July 20 in Kalamazoo

“Training Wheels” shows communities how to integrate bike facilities into existing infrastructure to make bicycling safe and convenient, providing alternate transportation that makes roads more complete for everyone. Classroom instruction using a guide produced by the American Association for State Highway and Transportation Officials (AASHTO) is followed by an on-road, on-bike portion. The outdoor segment provides participants a firsthand look at the benefits of providing an alternative mode of travel that does not require expensive facilities for communities to build or maintain.

The “Training Wheels” courses are intended for city, township or county managers; council members; engineers; and related design and planning staff. The course is eligible for five Professional Development hours for professional engineers. Advance registration only. A bicycle and helmet are required – please notify local host if needed, since limited equipment may be available. Registration deadline is June 28.

For details, contact Cynthia Krupp at 517-335-2923, or by e-mail at kruppc@michigan.gov.

Bikes on Amtrak: Progress?

Monday, April 23rd, 2012

What is the status of getting roll-on bicycle service for Michigan’s Amtrak trains?

MDOT told us we’d have it over a year ago. That didn’t happen.

A March article on MLive showed that Amtrak isn’t even close on this and that it’s become a bigger issue beyond Michigan.

“We’re committed — in new equipment purchases there will be space for bicycles,” [Amtrak Chairman Thomas] Carper said. “How we retrofit old equipment that’s going to be phased out over the next two, three, four, five years — some of the equipment is older than I am. So there’s a balance, a cost balance in there. How we retrofit, there’s some engineering things that need to be taken into consideration.”

He added that upgrading Michigan’s rail service for bicycles could likely come as part of an upgrade across the entire Midwest Amtrak fleet.

Last week MDOT released a press released on the U.S. DOT’s plans to buy 130 new rail cars, 25 of which would be used on Amtrak’s Michigan lines.

Rail car manufacturers across the country will have an opportunity to submit bids to produce the first American-made, standardized passenger rail cars, U.S. Transportation Secretary Ray LaHood announced today.

The $551 million Request for Proposals (RFP) to manufacture approximately 130 new bi-level passenger rail cars in America comes from a groundbreaking multi-state effort to jointly purchase standardized rail equipment to be used on Amtrak’s intercity routes in California, Illinois, Michigan, Indiana, Missouri, and potentially Iowa.

These new railcars “will also offer greater bicycle storage.”

Bids are due in a little over a month and the new rail cars will be delivered starting in mid-2015.

What we don’t know is how many existing railcars will be retrofitted to provide roll-on service sooner.

City of Detroit submits TIGER IV grant

Monday, March 19th, 2012

We mentioned Detroit submitted a TIGER III transportation grant that would have extended the Dequindre Cut and Midtown Loop. built bike lanes from Eastern Market to the planned Hamtramck Trail, and made major street improvements at Eastern Market.

That grant wasn’t funded though the city was told by one congressional office that it scored near the top.

The City is submitting an improved version of the grant request this round.

Competition?

One interesting wrinkle this time is it appears the M1 Rail group is applying for a $25 million TIGER IV grant as well. Even though it would be from the transit portion of TIGER IV, it’s unlikely two big grants would come to Detroit.

From the Detroit News:

[U.S. DOT Secretary Ray] LaHood said in January the government will consider awarding Detroit’s light-rail project up to $25 million on top of $25 million awarded for a bus rapid transit system.

LaHood told The Detroit News he is willing to offer additional government money if the M-1 light rail coalition can show it is financially viable.

Congressional aides said the M-1 plan assumes it will win the $25 million grant, which the FTA says is not certain.

The Detroit News is reporting the the U.S. DOT has “serious concerns” about the M1 Rail’s viability. The Detroit Free Press reports a more moderate response.

…while no decision has been made, there is skepticism in Washington, including concerns that the M-1 plan’s cost estimate — at $125 million — is too low and that the group of private investors won’t pull together enough private financing to qualify for a $25-million federal grant for the project.

Of course the other issue with M1 Rail and bicycling is their plan to run the street cars along the curbs. As we’ve said before, curbside alignments are problematic for cyclists and Complete Streets advocates.

Seattle cyclists sue

The street car tracks are a major safety issue and liability. At least a half-dozen Seattle cyclists have lawsuits against the city for crashes due to street car rails. We spoke with an attorney handling these cases and they said this would be a class action lawsuit if their office had the capacity to organize such an effort.

Does MDOT really want to open themselves up to that?

MDOT should know it’s a hazardous design for bicyclists — it’s mentioned as such in Detroit’s Woodward light rail reports.

There are safety concerns for bicycle users with [the curbside designs] due to the potential for bicycle tires to be caught within the rail flange space in the road. While alternative rail types may reduce this potential conflict, it cannot be fully mitigated.

Of course the odds are that neither project will receive the funding. It’s a hyper-competitive grant source.

Then again, Michigan’s only successful TIGER III grant was a road to a landfill, so anything is possible.