Posts Tagged ‘MDOT’

More on the West Bloomfield Trail extension

Sunday, January 29th, 2012

We mentioned a couple weeks ago that West Bloomfield had received Transportation Enhancement funding through the Road Commission for Oakland County.

The Spinal Column has more exciting details:

“We’re going to put a new limestone surface on top of the ballast similar to the existing trail, and have a safe road crossing at Arrowhead, Halsted and Walnut Lake,” said West Bloomfield Parks and Recreation Director Dan Navarre. “There will be 400 feet of boardwalk north of Walnut Lake over a wetland area and a pergola area with benches.”

There will be benches installed every quarter-mile and two overlooks with benches – one at Woodpecker Lake between Arrowhead and Halsted Road, and another over a large wetland area west of Halsted.

A small parking lot will be constructed at the terminus of the trail at Haggerty Road.

This will add 2.5 miles of pathway and extend the West Bloomfield Trail all the way to Haggerty Road. Here it will eventually connect with the Walled Lake, Commerce, and Wixom rail-trail also under development. MDOT has also suggested building a trail bridge across M-5 to connect the trails.

The Road Commission is even considering a speed table where the trail crosses Arrowhead — an innovative traffic calming design that we’d like to see more of. Not only does it act as a stretched speed bump for cars, it tells drivers that they’re crossing the trail. It visually says that the trail has a right-of-way. This is a design we would have preferred seeing where the Dequindre Cut crosses streets south of Jefferson.

As mentioned in the Spinal Column, the West Bloomfield trail extension should be under construction by May and completed by the end of summer.

Support Transportation Enhancements

Federal Transportation Enhancement funding really makes projects like this possible, but that funding source may get eliminated in Congress. A vote on this is coming up this week in the Transportation and Infrastructure Committee. Local congresswoman Candice Miller serves on this committee.

Please take a minute and call her office before Thursday’s vote and ask her to not eliminate this funding. Her Washington DC phone number is (202) 225-2106.

Let’s keep this funding in the next transportation bill!

 

MDOT grants announced for trails and streetscaping

Saturday, January 14th, 2012

MDOT has announced the latest round of Transportation Enhancement funding.

Here are the grantees from the three Metro Detroit counties.

Macomb County

The city of New Baltimore will make streetscape improvements to its historic downtown on Washington Street from Green Street to Front Street. The project will include streetlights, trees, planters, bike racks, street furniture, and staining the existing sidewalk. The project budget is $486,110, including $340,277 in federal TE funds and $145,833 from the city.

Oakland County

The Road Commission for Oakland County, in partnership with West Bloomfield Township, will construct a multi-use trail along an abandoned rail line from Arrowhead Road to Haggerty Road. The trail will be an extension of the West Bloomfield Trail, which connects to the Clinton River Trail. The project includes trail surfacing, roadway crossings, benches, trash receptacles, and trail shoulder restoration with native plant materials. The project budget is $1,111,692, including $611,431 in federal TE funds and $500,261 from West Bloomfield Township Parks and Recreation.

Wayne County

MDOT, in partnership with the city of Detroit and the Greening of Detroit, will install streetscape amenities along US-12 (Michigan Avenue) between 14th Street and Rosa Parks Boulevard. The work includes replacing the concrete sidewalks and adding brick pavers, tree planters, bike loops and trash receptacles. When the project is complete, the Greening of Detroit will place trees in the planters. The project budget is $407,351, including $325,881 in federal TE funds, $71,286 from MDOT and $10,184 from the city.

Both streetscape projects include bike racks.

What’s not on the list is the grant request for Trumbull in Detroit. As we’d last heard, this was a request to reconstruct Trumbull from Warren to W. Grand Boulevard, including adding bike lanes.

Another project that is expected to get funded soon is the next portion of the Conner Creek Greenway from the Mt. Olivet Cemetery to Eight Mile. It includes a combination of bikes lanes on E. Outer Drive/Conner, sidewalks, and bike routes.

As you may recall, Transportation Enhancements has been threatened to be cut in Washington DC. Now is as good a time as ever to contract your Congress member and remind them of the value in these transportation dollars.

Light rail, BRT and bicycles in Detroit

Monday, January 9th, 2012

It’s challenging keeping abreast of the recent announcements for the off-again, on-again light rail and now bus rapid transit (BRT) projects in Detroit.

The latest proposal is to build the M1-Rail’s 3-mile light rail on Woodward with BRT on Michigan, Woodward, and Gratiot.

Woodward Avenue

According M-Live, the M1-Rail group has “90 days to develop a plan to incorporate their 3.4 mile light rail line into the BRT system. Just how that will work on a practical level is something to be decided in the planning process, according to Bing spokesman Stephen Serkaian.”

Are we back to the curb-side versus center-running debate? Not sure.

Both the light rail and BRTs will all but certainly share a dedicated right-of-way and some stations. As wide as Woodward is, MDOT’s not going to dedicate four lanes to transit.

And in order for both projects to move most quickly while using federal dollars, they’ll likely use the DDOT light rail study which favored center running for most of the route. That coincides with a statement from the Mayor’s office that “Any light-rail studies to date can be applied to advance the approval and construction of rapid bus.”

Following the DDOT study would be fairly ideal for cyclists who want to continue riding safely on Woodward.

However, M-Live adds, “experts say the possibility of BRT ending in New Center is a real one.” That would make it easier to put light rail on the curbs, which would be?a terrible scenario for cyclists.

Michigan and Gration Avenues

For these roads, there are definitely more questions than answers at this point.

How will the BRT affect:

  • the new Corktown bike lanes?
  • the planned sharrows on Gratiot in Detroit?
  • the Woodward Avenue non-motorized planning north of Eight Mile?

We may not have answers to these for some time, especially since Woodward will likely be the first dip in the BRT waters.

We do know that BRT will be on state trunk lines and MDOT is committed to building Complete Streets.

Transportation key to young staying in Michigan

Thursday, January 5th, 2012

The Detroit News ran a commentary last month written by members of the Millennial Mayors Congress, which is “a partnership of city officials and rising leaders working together to address regional issues.”

Michigan’s transportation system is not getting young people where they need to go.

As citizens under 35, we know that not all of our peers can afford the $8,500 a year it takes, on average, to own a car. Some of us are looking to reduce our carbon footprints. Whatever the reasons, young people want to see a transportation system that gives everyone the freedom to get around, with or without a car. Unfortunately, failed transportation policies have been holding Michigan back.

Every year thousands of us leave for places that have functioning transit, safe biking and walking conditions, and convenient transportation between cities.

They also give support to Complete Streets.

We need to adopt a truly comprehensive “complete streets” policy, so Michiganians do not have to risk their lives to walk or bike.

It’s worth the time to read the entire opinion piece. It focuses mostly on public transit, which is expected since it was released during the recent Detroit light rail/bus rapid transit news.

Still widening highways

One minor correction? It speaks about MDOT widening highways in the past tense. MDOT is still widening highways.

Where did a majority of the transportation stimulus money go in Michigan? Widening an expressway. MDOT plans to spend well over a billion transportation dollars in Detroit over the next 20 years… to widen an expressway. Widening roads are still a funding priority for MDOT and many Metro Detroit municipalities.

Want to lose faith in Metro Detroit’s transportation decision makers? Take some time to review the road projects in SEMCOG’s transportation improvement plan (TIP).

Let’s look at the Road Commission for Oakland County’s 2012 TIP projects. They have $30.7 million in projects of which $21.8 million involves road widening.

Road agencies, SEMCOG, and others don’t like to publicize road widening projects because at the same time, they’re asking for more transportation funding.

They need the funding to continue building sprawl, but that’s not a good sales pitch — especially to millennials.

The Millennial Mayors Congress is also on Facebook.

Building community in Detroit with bicycles

Saturday, November 19th, 2011

The Free Press special report Living with murder: Complete coverage contains some positive coverage of Detroit residents building community. One story highlights bicycling’s role in the community fabric.

The brothers have lived for 40 years in a run-down house on the corner of Bessemore and Georgia. They’re members of The East Side Riders, a custom-bicycle club that gathers for casual rides. They hold workshops for neighborhood kids to show them simple things such as how to change a flat tire, to more difficult tasks such as customizing — or tricking out — their bikes. What started as fun has become a crime-fighting tool.

When the bodies of women were being found scattered on the east side inside abandoned houses and lots in the summer of 2009, the brothers rode around, handing out flyers and warning women not to walk alone. On Angels’ Night, the eve before Halloween, they’ve patrolled the neighborhood. They even ride along with children as they walk to and from school.

“We just want to keep it safe where we live,” said David Jarrell, 47.

This article also shows the great value places like the Hub of Detroit bring to the community. It’s great that we can find millions to build walking and biking facilities, but it’s challenging to find those same kinds of dollars for this bicycling support network. Both need to be supported if we’re to be successful in getting more Detroiters choosing bicycles.

Sharrows on Gratiot and Fort Street

Recently the East Side Riders asked for bike lanes on Gratiot, a route they often ride to get Downtown and to the RiverWalk. That request was passed along to MDOT. Years ago MDOT had discussed adding bike lanes to Gratiot but that would have removed the on-street parking – a non-starter for the city.

Now MDOT is looking to simply add sharrows, shared lane markings that remind motorists to share the road while providing guidance to cyclists on where to position themselves on the road. MDOT hopes to have them installed next year from Conner Avenue/Conner Creek Greenway to the Dequindre Cut. These may be a forerunner to some eventual bike lanes.

We recently spoke with Tim Springer from Springer Consulting in Minneapolis. He visited Detroit to share his experience with their Midtown Greenway and look at opportunities in Detroit.

One of his thoughts was to add separated two-way cyclepaths to our major spoke roads such as Gratiot and Grand River. Yes, it would take away some vehicle travel lanes, but those roads have extra capacity. While surveys find many Detroit residents would feel comfortable riding in bike lanes on major roads, other cities are finding that many more would feel comfortable on physically-separated bike lanes. And as Springer noted, the spoke roads are often the fastest routes to get across the city so we should prioritize investing in them for better bicycling.

As for sharrows, MDOT is also looking to add them on Fort Street in Southwest Detroit, a route used by the Underground Railroad Bicycle Route.