Archive for the ‘MDOT’ Category

MDOT grants announced for trails and streetscaping

Saturday, January 14th, 2012

MDOT has announced the latest round of Transportation Enhancement funding.

Here are the grantees from the three Metro Detroit counties.

Macomb County

The city of New Baltimore will make streetscape improvements to its historic downtown on Washington Street from Green Street to Front Street. The project will include streetlights, trees, planters, bike racks, street furniture, and staining the existing sidewalk. The project budget is $486,110, including $340,277 in federal TE funds and $145,833 from the city.

Oakland County

The Road Commission for Oakland County, in partnership with West Bloomfield Township, will construct a multi-use trail along an abandoned rail line from Arrowhead Road to Haggerty Road. The trail will be an extension of the West Bloomfield Trail, which connects to the Clinton River Trail. The project includes trail surfacing, roadway crossings, benches, trash receptacles, and trail shoulder restoration with native plant materials. The project budget is $1,111,692, including $611,431 in federal TE funds and $500,261 from West Bloomfield Township Parks and Recreation.

Wayne County

MDOT, in partnership with the city of Detroit and the Greening of Detroit, will install streetscape amenities along US-12 (Michigan Avenue) between 14th Street and Rosa Parks Boulevard. The work includes replacing the concrete sidewalks and adding brick pavers, tree planters, bike loops and trash receptacles. When the project is complete, the Greening of Detroit will place trees in the planters. The project budget is $407,351, including $325,881 in federal TE funds, $71,286 from MDOT and $10,184 from the city.

Both streetscape projects include bike racks.

What’s not on the list is the grant request for Trumbull in Detroit. As we’d last heard, this was a request to reconstruct Trumbull from Warren to W. Grand Boulevard, including adding bike lanes.

Another project that is expected to get funded soon is the next portion of the Conner Creek Greenway from the Mt. Olivet Cemetery to Eight Mile. It includes a combination of bikes lanes on E. Outer Drive/Conner, sidewalks, and bike routes.

As you may recall, Transportation Enhancements has been threatened to be cut in Washington DC. Now is as good a time as ever to contract your Congress member and remind them of the value in these transportation dollars.

Light rail, BRT and bicycles in Detroit

Monday, January 9th, 2012

It’s challenging keeping abreast of the recent announcements for the off-again, on-again light rail and now bus rapid transit (BRT) projects in Detroit.

The latest proposal is to build the M1-Rail’s 3-mile light rail on Woodward with BRT on Michigan, Woodward, and Gratiot.

Woodward Avenue

According M-Live, the M1-Rail group has “90 days to develop a plan to incorporate their 3.4 mile light rail line into the BRT system. Just how that will work on a practical level is something to be decided in the planning process, according to Bing spokesman Stephen Serkaian.”

Are we back to the curb-side versus center-running debate? Not sure.

Both the light rail and BRTs will all but certainly share a dedicated right-of-way and some stations. As wide as Woodward is, MDOT’s not going to dedicate four lanes to transit.

And in order for both projects to move most quickly while using federal dollars, they’ll likely use the DDOT light rail study which favored center running for most of the route. That coincides with a statement from the Mayor’s office that “Any light-rail studies to date can be applied to advance the approval and construction of rapid bus.”

Following the DDOT study would be fairly ideal for cyclists who want to continue riding safely on Woodward.

However, M-Live adds, “experts say the possibility of BRT ending in New Center is a real one.” That would make it easier to put light rail on the curbs, which would be?a terrible scenario for cyclists.

Michigan and Gration Avenues

For these roads, there are definitely more questions than answers at this point.

How will the BRT affect:

  • the new Corktown bike lanes?
  • the planned sharrows on Gratiot in Detroit?
  • the Woodward Avenue non-motorized planning north of Eight Mile?

We may not have answers to these for some time, especially since Woodward will likely be the first dip in the BRT waters.

We do know that BRT will be on state trunk lines and MDOT is committed to building Complete Streets.

Transportation key to young staying in Michigan

Thursday, January 5th, 2012

The Detroit News ran a commentary last month written by members of the Millennial Mayors Congress, which is “a partnership of city officials and rising leaders working together to address regional issues.”

Michigan’s transportation system is not getting young people where they need to go.

As citizens under 35, we know that not all of our peers can afford the $8,500 a year it takes, on average, to own a car. Some of us are looking to reduce our carbon footprints. Whatever the reasons, young people want to see a transportation system that gives everyone the freedom to get around, with or without a car. Unfortunately, failed transportation policies have been holding Michigan back.

Every year thousands of us leave for places that have functioning transit, safe biking and walking conditions, and convenient transportation between cities.

They also give support to Complete Streets.

We need to adopt a truly comprehensive “complete streets” policy, so Michiganians do not have to risk their lives to walk or bike.

It’s worth the time to read the entire opinion piece. It focuses mostly on public transit, which is expected since it was released during the recent Detroit light rail/bus rapid transit news.

Still widening highways

One minor correction? It speaks about MDOT widening highways in the past tense. MDOT is still widening highways.

Where did a majority of the transportation stimulus money go in Michigan? Widening an expressway. MDOT plans to spend well over a billion transportation dollars in Detroit over the next 20 years… to widen an expressway. Widening roads are still a funding priority for MDOT and many Metro Detroit municipalities.

Want to lose faith in Metro Detroit’s transportation decision makers? Take some time to review the road projects in SEMCOG’s transportation improvement plan (TIP).

Let’s look at the Road Commission for Oakland County’s 2012 TIP projects. They have $30.7 million in projects of which $21.8 million involves road widening.

Road agencies, SEMCOG, and others don’t like to publicize road widening projects because at the same time, they’re asking for more transportation funding.

They need the funding to continue building sprawl, but that’s not a good sales pitch — especially to millennials.

The Millennial Mayors Congress is also on Facebook.

Feds fail to fund Detroit’s inspired TIGER project

Friday, December 16th, 2011

[Disclaimer: I provided assistance to the city of Detroit on this TIGER grant application.]

It wasn’t a good week in Detroit for transportation news.

First came the light rail decision, and now this. The U.S. DOT did not select Detroit’s TIGER III grant.

There were 828 application and only 46 were selected. The odds weren’t good but Detroit’s $20 million grant request was first-class.

It was called Link Detroit, a Multi-model enhancement plan and a copy of it is available on the city’s web site.

The listed project benefits were:

  • Implements a $25 million infrastructure project that includes bridge replacements, streetscapes, on and off road non-motorized greenways ($20 million DOT grant, $5.8 million local match)
  • Links Detroit’s core investments such as the Riverfront Conservancy and adjacent downtown central businesses through the Dequindre Cut and Midtown Loop greenways to the Eastern Market, Midtown and Hamtramck
  • Intersects major transportation routes including auto, bus, and the planned Woodward Light Rail, enabling multi modal options from anywhere in the region
  • Enhances non-motorized and multi-modal connections to:
    • Jobs (downtown and midtown anchors, locally owned commercial/professional services, start up establishments, hotels and restaurants, eastern market district)
    • Educational institutions (Wayne State)
    • Cultural institutions (DIA, MOCAD, DSO, theatres)
    • Recreational opportunities (Milliken State Park, numerous city parks, marinas)
    • Famers market (Eastern Market)
    • Neighborhoods (Midtown, Hamtramck, East Villages)
  • Leverages significant investments already made in the transportation infrastructure (Campus Martius, Detroit RiverWalk, Woodward Light Rail, Dequindre Cut Greenway, Midtown Loop Greenway, Hamtramck Greenway) and real estate development (Downtown, Midtown, Eastern Market)
  • Provides 289 direct near term jobs, and up to 16,000 long term jobs, assuming the residential and commercial fill in development typically stimulated by this kind of investment

Can Detroit just reapply for TIGER IV? That’s uncertain.

Congress has asked that TIGER “focus on road, transit, rail and port projects.” One source says it’s not a ban on bike-ped oriented projects, but that future focus doesn’t help Link Detroit.

In addition, some of the matching funds will likely be spent before the next TIGER round, and therefore will become ineligible.

Detroit had received $25 million in the first round of TIGER grants. That money was to be spent on the Woodward light rail and will now be applied towards planning bus rapid transit. We don’t know what role this previous award and the city’s current financial situation had in this grant request cycle.

No Dequindre Cut Extension?

This does not stop the planned Dequindre Cut extension. The city has a purchase agreement for the private property from Gratiot to Mack and is now doing due diligence. The funding is there to keep moving this project forward.

Eventually the Midtown and Hamtramck connections will be built once the needed funding is found. TIGER III would have put these critical projects on the front burner.

Other Michigan TIGER grants

The only successful TIGER III grant was for $3.6 million to rebuild 2.6 miles of road in St. Clair County which “provides essential access to the County’s only landfill facility.” Yeah, that stinks.

That said, we’re not surprised the MDOT/Canton TIGER request was rejected. This was a $22 million project to improve the IKEA exit on I-275.

The required grant section on Livability appears to have been written in the 1980s or earlier. One claimed project benefit is it will improve the quality of life by having “a safer operational and connected network to and from the surrounding community and the freeway network.” That and they won’t remove the existing bike path.

The grant’s section on Alternative Transportation and Sustainable Development says, Canton is “committed to promoting sustainable development opportunities and alternative transportation options for residents.” Canton opted out of SMART. You cannot take the SMART bus to the IKEA store.

If anything, this is an example of why transportation in Michigan is not a sustainable model. We let a major traffic generator locate in an area which lacks the existing transportation infrastructure to handle it. And now Canton (and MDOT) want taxpayers to fix their $22 million mistake.

IKEA even mentioned in their support letter for this grant that “when IKEA was considering potential locations for our Michigan store, we had strong concerns about the interchange.”

But to be fair, there are other costly expressway exit examples, from the Chrysler headquarters to the Great Lakes Crossing at Baldwin. We have a history of funding mistakes.

The bottom line is Michigan can’t afford to keep ignoring the obvious relationship between land use and transportation.

 

 

Biking and walking on the new Detroit bridge?

Tuesday, December 6th, 2011

Governor Rick Synder continues to push forward on the New International Trade Crossing (NITC) bridge between Detroit and Windsor. Given the apparent lack of support within his own party, the governor may now “go it alone” according to the Detroit Free Press.

One question we hear often is will the new bridge allow bicyclists and pedestrians along with motor vehicles?

But first, let’s mention that the Ambassador Bridge used to allow both on a narrow sidewalk — a sidewalk that is no longer there after the most recent re-decking. Without access to the Tunnel or operating ferry service, bicyclists have no convenient means to cross between the two countries. (Pedestrians can use the Tunnel Bus.) Could the NITC be an answer?

No one knows for certain whether we’ll get bicycles on the NITC as of today, but here’s what the Final Environmental Impact Statement (FEIS) says:

The new bridge over the Detroit River and the plaza will be engineered to accommodate bicycles and pedestrians. U.S. Customs and Border Protection and its Canadian counterpart (Customs and Border Services Agency) will determine whether this traffic is allowed. All facilities will be designed to meet Americans with Disabilities Act (ADA) standards. This will include sidewalks along the roads to be repaved as part of the project. This will be an upgrade at many facilities as they were built before the ADA requirements were established.

“Engineered to accomodate” is further defined in the 2008 Bridge Structure Study:

Initially, the section consists of three lanes in each direction, with a 1m flush median between travel directions and 3m outside shoulders. A sidewalk is only currently required on the U.S. bound approach to the toll and inspection plaza. This sidewalk is separated from the shoulder with a traffic barrier. A 1.066m metal railing provides fall protection on the outside of the sidewalk.

The designs show this sidewalk is 5.2 feet wide and more like a shared-use path. And having this path on the U.S. bound is smart since bikes and pedestrians will have the best views of both downtown skylines.

There are also 10 foot shoulders on both sides of the bridge.

The bad news? The Study says that if there’s increased motorized traffic, the path would be removed and the shoulders narrowed in order to add more lanes. However, we doubt traffic demands would necessitate that.

This brings up another question. would they allow a cyclist without a passport to pay the bridge toll, bike to the middle of the bridge, enjoy the view, then return back to their respective county?

MTGA Comments

During the FEIS process, the Michigan Trails and Greenways made these comments and received MDOT responses.

MTGA Comment MDOT Response
Which AASHTO bicycle facility type would be used [on the new Detroit River bridge], bike lanes or shared lanes The commenter is referred to the “Detroit River International Crossing Study, Bridge-Type Study Report,” dated January 2007, Revised July 2007. This document is on the project Web site (www.partnershipborder study.com) under U.S. Reports, Bridge Type Study Report. It discusses bike lane options (pages 3 and 29). A final decision on the bicycle treatment will be made in the design phase
The report does not address bicycling access from the bridge to the processing area to local surface streets. Shared pathways would likely be acceptable for these connections but not narrow sidewalks per AASHTO’s Guide for the Development of Bicycling Facilities. The accommodation for bicycles on the new river bridge is likely to be the right shoulder. When exiting the bridge, a bicyclist would remain to the right of traffic and proceed to a separate building near the primary processing booths for vehicles. After processing, there would be an exit to Jefferson Avenue. All of this is subject to the determination of the U.S. Department of Homeland Security and its Canadian counterpart to allow bicycle use of the new Detroit River bridge.
the FEIS. . . does not mention the Corktown-Mexicantown Greenlink, Southwest Detroit greenways, and Fort Street Greenway projects. These project should not be negatively impacted by the DRIC. MDOT will investigate ways to integrate these projects.
It appears the FEIS does not analyze the DRIC impact on the Detroit Non-motorized Transportation Master Plan . . . Any local road reconstruction that has been identified as a bike route should be rebuilt to accommodate bikes per the plan. MDOT will investigate ways to integrate these projects.
The AASHTO U.S. Bicycle Route System (USBRS) has a designated corridor (Route 25) that includes the DRIC. Though the road route has not yet been set, it is likely to follow Fort Street or Jefferson Avenue. It is important that nay DRIC plan consider bicycling access?between this route and the new bridge. This connecting to Canada would be an invaluable addition to the Bicycle Route System MDOT will investigate ways to integrate these projects.
The cities of Detroit and Windsor are actively pursuing improved nonmotorized transportation and greenway trail networks. Connecting these two systems would bring a unique and significant benefit to the Metro Detroit and Windsor communities Comment acknowledged. As noted in the FEIS Section 3.5.6.1, U.S. Customs and Border Protection, along with its Canadian counterpart, will determine whether pedestrian and bicycle traffic is allowed on the new Detroit River bridge

Similar comments were made during the Canadian Environmental Assessment process, however they do not appear to have published written responses.