Archive for the ‘Trails’ Category

Google Bicycle Layer: Detroit additions

Wednesday, December 21st, 2011

Google Maps has a bicycle layer which shows three main types of bicycle facilities: off-road pathways (dark green), roads with bike lanes (lighter green), and roads that are preferred bicycle routes (dotted green).

As of this today, the city of Detroit has been updated.

  • Milbank Greenway added
  • Conner Creek Greenway added (including St. Jean and Clairpointe bike lanes)
  • Southwest Detroit Greenlink added (bike lanes only)
  • Atwater bike lanes added
  • “bike lanes” on Joy Road removed
  • “bike lanes” on Fort Street removed
  • RiverWalk sections added

There are still more corrections to make.

  • W. Outer Drive and W. Chicago are shown with bike lanes when they only have shoulders.
  • There are still some sections of sidewalk shown as “preferred” bicycle routes.
  • The Southwest Detroit Greenlink bike routes should be labelled as “preferred.”

We’ll get to these changes unless someone beats us to it.

We also removed the sidewalk along Lakeshore through the Pointes as a preferred bicycle path/trail.

What are the benefits?

For one, the map can help cyclists map their route. It’s interactive and up to date, though some may still prefer a printed bike map, especially since not everyone has a smart phone or direct access to the Internet.

Having an accurate bicycle layer also affects how Google generates bike route directions. Google will try to route cyclists on to bike lanes and preferred routes when it makes sense.

On the other hand, having an inaccurate bicycle layer can make bike directions less valuable. Google has directed us out of our way to use a sidewalk in Troy that has been labelled as a preferred bicycle route.

How to update the bicycle layer

The bicycle layer can be updated using the Google Mapmaker utility. There is a review and approval process for changes so it’s not as instant as Wikipedia.

Mapmaker gives you the ability to change roads attributes, sidewalks, places, and more. It appears bike racks are not being added to this map.

Guide to Mapmaker bicycle facilities

The Google guidelines on how to appropriately label bicycle facilities aren’t always that clear, but here are some key points.

  • Paved shoulders are not bike lanes. Google’s best practices says, “Roads without explicit paint markings or signage indicating a bicycle lane should not be given the ‘On-street bicycle lane attribute'”. Since paved shoulders of adequate width can improve bicycling, they can be labeled as “preferred.”
  • Sidewalks and sidepaths are not trails/paths. Sidewalks and sidepaths should be documented as part of the road attributes. Google’s best practices says they should only be mapped as separate trails/paths when they’re “separated by a river, railway, or other impassable physical barrier.” Yes, many parts of Oakland County has improperly labelled bicycle features.
  • Sidewalks are rarely preferred bicycle routes. If the above guideline is followed, sidewalks along roads can’t be. It’s less clear for sidewalks that are not along a road. In some cities like Royal Oak, bicycling on a sidewalk is prohibited. Sidewalks aren’t usually not cleared of snow by cities unlike streets, so their value in the winter can be variable. We’ve removed a preferred sidewalk segment in Royal Oak that had stairs.

Feds fail to fund Detroit’s inspired TIGER project

Friday, December 16th, 2011

[Disclaimer: I provided assistance to the city of Detroit on this TIGER grant application.]

It wasn’t a good week in Detroit for transportation news.

First came the light rail decision, and now this. The U.S. DOT did not select Detroit’s TIGER III grant.

There were 828 application and only 46 were selected. The odds weren’t good but Detroit’s $20 million grant request was first-class.

It was called Link Detroit, a Multi-model enhancement plan and a copy of it is available on the city’s web site.

The listed project benefits were:

  • Implements a $25 million infrastructure project that includes bridge replacements, streetscapes, on and off road non-motorized greenways ($20 million DOT grant, $5.8 million local match)
  • Links Detroit’s core investments such as the Riverfront Conservancy and adjacent downtown central businesses through the Dequindre Cut and Midtown Loop greenways to the Eastern Market, Midtown and Hamtramck
  • Intersects major transportation routes including auto, bus, and the planned Woodward Light Rail, enabling multi modal options from anywhere in the region
  • Enhances non-motorized and multi-modal connections to:
    • Jobs (downtown and midtown anchors, locally owned commercial/professional services, start up establishments, hotels and restaurants, eastern market district)
    • Educational institutions (Wayne State)
    • Cultural institutions (DIA, MOCAD, DSO, theatres)
    • Recreational opportunities (Milliken State Park, numerous city parks, marinas)
    • Famers market (Eastern Market)
    • Neighborhoods (Midtown, Hamtramck, East Villages)
  • Leverages significant investments already made in the transportation infrastructure (Campus Martius, Detroit RiverWalk, Woodward Light Rail, Dequindre Cut Greenway, Midtown Loop Greenway, Hamtramck Greenway) and real estate development (Downtown, Midtown, Eastern Market)
  • Provides 289 direct near term jobs, and up to 16,000 long term jobs, assuming the residential and commercial fill in development typically stimulated by this kind of investment

Can Detroit just reapply for TIGER IV? That’s uncertain.

Congress has asked that TIGER “focus on road, transit, rail and port projects.” One source says it’s not a ban on bike-ped oriented projects, but that future focus doesn’t help Link Detroit.

In addition, some of the matching funds will likely be spent before the next TIGER round, and therefore will become ineligible.

Detroit had received $25 million in the first round of TIGER grants. That money was to be spent on the Woodward light rail and will now be applied towards planning bus rapid transit. We don’t know what role this previous award and the city’s current financial situation had in this grant request cycle.

No Dequindre Cut Extension?

This does not stop the planned Dequindre Cut extension. The city has a purchase agreement for the private property from Gratiot to Mack and is now doing due diligence. The funding is there to keep moving this project forward.

Eventually the Midtown and Hamtramck connections will be built once the needed funding is found. TIGER III would have put these critical projects on the front burner.

Other Michigan TIGER grants

The only successful TIGER III grant was for $3.6 million to rebuild 2.6 miles of road in St. Clair County which “provides essential access to the County’s only landfill facility.” Yeah, that stinks.

That said, we’re not surprised the MDOT/Canton TIGER request was rejected. This was a $22 million project to improve the IKEA exit on I-275.

The required grant section on Livability appears to have been written in the 1980s or earlier. One claimed project benefit is it will improve the quality of life by having “a safer operational and connected network to and from the surrounding community and the freeway network.” That and they won’t remove the existing bike path.

The grant’s section on Alternative Transportation and Sustainable Development says, Canton is “committed to promoting sustainable development opportunities and alternative transportation options for residents.” Canton opted out of SMART. You cannot take the SMART bus to the IKEA store.

If anything, this is an example of why transportation in Michigan is not a sustainable model. We let a major traffic generator locate in an area which lacks the existing transportation infrastructure to handle it. And now Canton (and MDOT) want taxpayers to fix their $22 million mistake.

IKEA even mentioned in their support letter for this grant that “when IKEA was considering potential locations for our Michigan store, we had strong concerns about the interchange.”

But to be fair, there are other costly expressway exit examples, from the Chrysler headquarters to the Great Lakes Crossing at Baldwin. We have a history of funding mistakes.

The bottom line is Michigan can’t afford to keep ignoring the obvious relationship between land use and transportation.

 

 

Detroit looks to make biking legal on RiverWalk

Tuesday, December 13th, 2011

It’s legal to ride your bike on most of the Detroit RiverWalk except for the portion in front of Hart Plaza.

Why? Because of this city ordinance:

Sec. 40-4-7. – Wheeled vehicles prohibited.

No wheelbarrow, handcart, automobile, motorcycle, bicycle, motordriven cycle, go-cart, unicycle, moped, solex cycle or other wheeled vehicles are permitted in Hart Plaza except as approved by the civic center department or recreation department for a scheduled event. This section shall not apply to a handicapped person in a wheelchair nor to emergency or service vehicles.

Razor A5 kick scooter review – what’s this little motorized scooter that looks like a cross between a ski and a skateboard? Find out at Go2Scooter, it may just look like a cross between a ski and a skateboard, but the kick scooter really is a unique scooter that combines the fun of a snowboard with the convenience of a motorcycle. A perfect mix of speed and simplicity, this kick scooter truly is a perfect match for anyone who enjoys skating or riding a motorcycle. Its large urethane wheels provide an extra smooth ride, while its sturdy frame supports rider of up to 100 kilograms.

It’s a little policy issue we shared with our wonky friends, but it wasn’t a big problem on the RiverWalk since it wasn’t enforced.

Apparently it’s more of big deal now because the Detroit Riverfront Conservancy will soon maintain that portion of the RiverWalk. Currently the Downtown Development Authority (DDA) maintains the RiverWalk from the Port Authority to Joe Louis Arena. The Detroit Recreation Department is developing a maintenance agreement for the Conservancy to take the reins.

The Recreation Department is asking City Council to change the ordinance’s definition of Hart Plaza to not include the RiverWalk. They said it would be the “most direct and expedient resolution.”

Doing this solves the bicycling issue and others. For example, it’s also not legal to walk your dog or roller skate on this section of RiverWalk.

We’d rather the ordinance not restrict bicycles (or unicycles!) in all of Hart Plaza except during events, but the above proposal is a step in the right direction.

We do have to wonder why solex cycles were called out in the ordinance.

 

Commerce rail-trail section gets critical funding

Friday, December 9th, 2011

Three is a charm for the Commerce, Walled Lake and Wixom rail-trail.

After two previous rejections, the Michigan Natural Resources Trust Fund recommended they receive a $3,755,400 grant to acquire the now-abandoned rail corridor which runs between the West Bloomfield Trail and the Huron Valley Trail in Wixom.

This near 33 acres provides a critical connection between the two trails mentions, but especially in the context of the Great Lake to Lake Trail which connects St. Clair to Lake Michigan. This new trail would also connect with the planned M-5 Trail which is a northern?extension?to the I-275 Metro Trail.

The funding also includes acquisition of the?Walled Lake Train Depot which would be used as a historic stopping point along the route.

Other projects in Macomb, Oakland, and Wayne Counties were recommended:

  • City of Dearborn (Wayne County) is recommended to receive $268,900 to develop a new bridge across the Huron River on the Camp Dearborn non-motorized trail with a fishing pier and canoe launch.
  • City of Detroit (Wayne County) is recommended to receive $300,000 for improvements to Jayne-Lasky Playfield, including development of walking trails, relocation of a soccer field, renovations to two softball diamonds, landscaping improvements and site amenities.
  • City of Detroit (Wayne County) is recommended to receive $300,000 for improvements to Lipke Playfield, including relocation of a football field, conversion of open space, horseshoe courts, renovation of a softball diamond, walking trails, landscaping and site amenities.
  • Huron-Clinton Metropolitan Authority (Oakland County) is recommended to receive $94,000 for improvements to Kensington Metropark to include a pond overlook, replace a seawall, walks and railing, group seating area, interpretive signage, viewing scopes and accessibility to pond dipping programs.
  • City of Inkster (Wayne County) is recommended to receive $300,000 to construct a trail within the Lower Rouge Parkway System.
  • City of Lathrup Village (Oakland County) is recommended to receive $50,000 to replace playground equipment at Goldengate Park.
  • Oakland Township (Oakland County) is recommended to receive $300,000 to develop a paved trail, boardwalks, pedestrian bridges, interpretive/directional signage and fishing access on the Paint Creek Trail/Polly Ann Trail south connector.
  • Southeast Michigan Eco-Region Consolidation is recommended to receive $1,475,000 for the acquisition of critical in-holdings within existing boundaries in state parks and recreation areas, state game areas, state harbors and Natural Rivers areas.

 

West Bloomfield trail: Its history and expansion

Wednesday, November 30th, 2011

Parks and Recreation Director Dan Navarre is giving a presentation on both the history of the West Bloomfield Trail and the plans for its expansion. That expansion runs from Arrowhead Road west to Haggerty Road.

This trail is a key portion of the Great Lake to Lake Trail.

This free presentation is being held on Saturday, December 3rd at 11am at Marshbank Park (2805 Hiller Road, north of Commerce.)

The event is hosted by the Friends of West Bloomfield Parks and Recreation. If you want more information, contact Doug McEwen at 248 788-3940.